Reluctance to compute tolerance intervals

  • Needed support with the preparation of Module 3 and corresponding Module 2.3 documents for drug substances and drug products:
    • To reflect the current status of manufacturing process and state of the scientific art analytical procedures
    • To close gaps and achieve GMP compliance of regulatory documentation.
  • Required on-going lifecycle management for all drug product licences needed.
Download